I-75 Project Begins in Oakland County Michigan Next Month

If you live or commute in Oakland County and were already sick of the number of orange construction barrels on the roads, you will be in for a big treat come mid-August. The Michigan Department of Transportation announced on July 19th, 2016 that the first project in the rebuilding of I-75 in Oakland County will begin this August. 

The two-year $90.8 million investment, which will stretch from Coolidge Highway to South Boulevard, will include reconstructing pavement, replacing bridges, and modernizing the Square Lake Road interchange. The Square Lake Road project involves replacing the left lane ramps at northbound I-75, and this will continue throughout the winter months. The good news however is that according to MDOT, this project will not impact traffic flow, like most construction projects usually do. 

“Starting in mid-August, two lanes will be open in each direction of I-75 between Coolidge Highway and Squirrel Road, in order to safely allow crews to construct temporary crossovers. In September, two-way traffic will share the southbound lanes to allow for the reconstruction of northbound I-75, along with bridge replacement at Adams, Square Lake, and Squirrel roads,” MDOT said in a released statement. This roadwork will continue to impact commuters on I-75 and will remain in place until mid-December, when all lanes will be expected to open back up. 

Oakland County residents aren’t exactly pleased with the upcoming construction in their area. More specifically, residents are upset about the increased noise that will be present due to all of the road work. “The construction is something we know can’t be stopped, and in the long run it’ll be fine. But the noise has tripled in places in my condo I’ve never had it before,” Karen Mellot, a resident of a condo complex located along I-75, told C&G Newspaper. At a meeting held by Oakland County Commissioner Shelley Goodman Taub and MDOT officials, residents caused an uproar, with many shouting at MDOT presenters and others walking out of the room.


As frustrating as ongoing construction may be, drivers are highly discouraged from runing their car right through those orange construction barrels and plowing their way through traffic. By not allowing frustration to turn into road rage drivers can avoid car accidents, crash related injuries, and a meeting with the police. If you or somebody you know has been injured in a car accident caused by aggressive driving, call The Michigan Law Firm, PLLC. Our attorneys will work alongside you to get you the help you need and deserve. Call us today, at 844.4MI.FIRM for a free consultation.